카테고리 없음

Date idea an clemente

ographysunline 2024. 1. 10. 05:58

That effort was meant to address San Clemente’s other environmental conundrum: beach erosion. That was just two weeks after passenger service had been restored following a six-month, $1.5-million effort to stabilize the sand beneath the tracks. The slope failure sent debris hurtling onto train tracks on the beach below and brought passenger rail service to a halt.